Electrolysers
Electrolysers VJIKKS ENGG POWER (M) SDN BHD

 
Press Release
VJIKKS ENGG POWER wins big tender from Malaysiaa€?s Largest Thermal Power Plant

VJIKKS ENGG POWER (M) SDN BHD, since inception in 2010, has continuously been growing as a One Stop Engineering Solutions provider , have successfully won another bigger tender from KAPAR ENERGY VENTURES (KEV) also known as SJSSAA Kapar, is the largest thermal plant in Malaysia, located 56km west of Kuala Lumpur facing the straits of Malacca.

KEV generating 2420MW which contribute 15% of the country's energy demand. Besides, it is the only power plant in Malaysia with triple fuel firing capability.

VJIKKS ENGG POWER (M) SDN BHD, in its quest to become a One Stop Engineering Solutions provider with its continuous effort, to serve the customers with First World Quality Products and Solutions at Third World Price,replica watches won a tender for supply of Heat alloy and SS tubes in large quantity for High Pressure Boilera€?s Super Heater and Reheater application. This tender has been won under stiff competition from other tenderers.

This is the first major tender won by VJIKKS ENGG POWER (M) SDN BHD for the supply of boiler tubes after the company decided to participate in tenders for supply of such products for power plants.

The company emboldened with its team of power plant experienced personnel have been continuously exhibiting its courage, to daringly come out with innovative solutions not only to Malaysiaa€?s Utility TNB and other Private Power Plants , but also to other industries with more and more products and solutions.

Audemars Piguet Replica Watches
 
 
products
  • Electrochlorinators
  • Any equipment made out of precious materials TITANIUM, TANTALUM, NIOBIUM, ZIRCONIUM, NICKEL, HASTELLOY, MONEL, INCONEL, X-750, PLATINUM, RUTHENIUM, IRIDIUM, PALLADIUM and its alloys
  • Cathodic protection anodes of any shape
  • Alumina Ceramics for Corrosive fluid handling
 
Vjikks Engg Power, Copyrights reserved 2015
. . .
. . .